DECAN_S2_Maintenance(Eng_Ver4.3).pdf - 第32页

chapt er 2 Inspe ction It ems fo r Main t e nanc e Advanced Chip Shooter DE CAN S2 M ain ten an ce H and bo ok 2-5 Monthly Inspections (1/2) Che ck-up List Rep la cement Time Referen ce Time requ ired Per iod No Inspecti…

100%1 / 92
chapter 2
Inspection Items for Maintenance
Advanced Chip Shooter
DECAN S2 Maintenance Handbook
2-4
Weekly Inspections
Inspection Items for Maintenance
chapter 2
Inspection Items for Maintenance
Advanced Chip Shooter
DECAN S2 Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Right Cover Cooling Fan Inspect and Replace
Flathead Screw driver, vacuum
cleaner
10 Minutes
M-4 Front, Rear Cover Cooling Fan Inspect and Replace Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
Based on the regulated use environment.
If the use environment is poor, the intervals for part inspection and replacement can be shortened.
In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)
chapter 2
Inspection Items for Maintenance
Advanced Chip Shooter
DECAN S2 Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance