Carrying out Final Safety Checks 3.5.1 Safety Check According to DIN EN 60204
32 Assembly Instructions SIPLACE E
3.5
3.5 Carrying out Final Safety Checks
Carrying out Final Safety Checks
After completion of the conversion work, final checks must be performed:
"3.5.1 Safety Check According to DIN EN 60204" [ ➙ 32]
"3.5.2 Vacuum Air Flow Check" [ 32]
Observe the relevant country-specific regulations and laws for this.
3.5.1
3.5.1 Safety Check According to DIN EN 60204
Safety Check According to DIN EN 60204
The safety check comprises:
an insulation test
a high-voltage test
a PE conductor test on the machine and components
Equipment and Tools Required
a barrier chain to secure the testing area
a red flashing light to signal the high-voltage tests
country-specific warning and identification signs to draw attention to the fact that work and high-volt
-
age tests are being carried out on the electrical system.
3.5.2
3.5.2 Vacuum Air Flow Check
Vacuum Air Flow Check
Check the air flow direction of the vacuum pump.
If the air flow direction is not correct, reconfirm the AC phase cable connection.
DANGER
RISK OF DEATH
Make sure that no unauthorized persons can come into contact with any parts of the ma
-
chine.
Secure the testing area with a barrier chain and warning signs.
Switch on a red flashing light during the high-voltage test.