00198481-01_Technical_Training_E_by_DEK_EN - 第29页

4 Conveyor System Room for Your Sketches and Notes Technical Training E by DEK 12/2017 29 Room for Your Sketches and Notes

100%1 / 114
4 Conveyor System
4.7 Maintenance
28 Technical Training E by DEK 12/2017
Problems Solution
Board remains jammed (time overflow)
Check the board width in the product
Check belt support after running in
Check parallelism of the rails
Board / belt jumps from the rail
Belt testing (stretching)
Check belt speeds
Check pulleys
Distance belt support (0.3-0.35mm check)
4.7 Maintenance
Maintenance tasks (For detailed instructions refer to the technical reference manual).
Maintenance content Interval Requirement
Ensure table surface is free from contamination daily IPA Wipes
Ensure vane does not foul the sensor 6 monthly -
Check belt condition 6 monthly -
Ensure all cabling is free and not trapped by table movement 6 monthly -
4 Conveyor System
Room for Your Sketches and Notes
Technical Training E by DEK 12/2017 29
Room for Your Sketches and Notes
4 Conveyor System
Room for Your Sketches and Notes
30 Technical Training E by DEK 12/2017