00198481-01_Technical_Training_E_by_DEK_EN - 第33页

5 Gantry Systems 5.1 Print Carriage Technical Training E by DEK 12/2017 33 5.1.3 Print Carriage Motor 1. Gearbox 2. Servo motor 3. Drive electronics 4. Processor 5. CAN Open interface 6. CAN bus 7. Power CAN bus controll…

100%1 / 114
5 Gantry Systems
5.1 Print Carriage
32 Technical Training E by DEK 12/2017
5.1.1.1 Reference run / Homing sequence
During the reference run the system is initialized. The home sensor drives slowly towards the
home sensor vane until the sensor is activated.
Then the motor changes direction and moves away from the vane until the sensor is
deactivated
The motor stops and the home is reached
1. Home sensor vane
2. Home sensor
5.1.2 Overview Print Carriage Electrical System
5 Gantry Systems
5.1 Print Carriage
Technical Training E by DEK 12/2017 33
5.1.3 Print Carriage Motor
1. Gearbox
2. Servo motor
3. Drive electronics
4. Processor
5. CAN Open interface
6. CAN bus
7. Power
CAN bus controlled
5.1.4 Parts Exchange / Settings / Calibrations
5.1.4.1 Parts Exchange / Settings / Calibrations
Print Carriage Parts
Exchange
Tools/ Setting Calibration
Node 3 Board Squeegee pressure feedback
calibration
Print Carriage belt Force Meter with hook
12kgs.
Print Carriage Motor Force Meter with hook
12kgs.
Home Sensor / Vane Check Home Position
For the defined measuring position please refer to the technical reference manual
5 Gantry Systems
5.1 Print Carriage
34 Technical Training E by DEK 12/2017
5.1.4.2 Print Carriage Calibrations
Overview Print Carriage Home position setup
1. Right Hand Printhead A – Detailed view
2. Front Rail 4. Print Carriage Machined Face
3. Home Sensor Vane B – Detailed view
5. Belt Support Plate