PS288_OwnersMnl_PriorTo2009 - 第4页

Table of Contents 2 • Set Up Making the Necessary Connections 2-1 Pneumatic Input and Controls 2-2 Electrical Input 2-3 Applying Power for the First Time 2-4 Setting Up Static Tray Input/Output 2-5 (Optional) Setting Up …

100%1 / 216
Table of Contents
• Preface
Contacting Data I/O -i
World Wide Web -i
E-mail -i
Telephone -i
Data I/O Customer Support -ii
Worldwide -ii
China -ii
Hong Kong -ii
Germany -ii
Other Countries -ii
Warranty Information -ii
Repair Service -iii
User or Address Change -iii
About This Manual -iv
Warnings, Cautions, and Safety Symbols -iv
1 • Introduction
System Description 1-1
Specifications 1-2
Terms Used to Indicate Direction 1-2
Four Basic Operations 1-3
Subassemblies 1-3
Input/Output Options and Combinations 1-9
Safety Systems 1-9
Software and User Interface Components 1-10
TaskLink Interface 1-11
AH500 Interface 1-12
Laser Interface 1-15
Required Facilities for Operation 1-15
Precautions for Safe Operation 1-15
Laser Safety 1-16
Laser Specifications 1-17
Laser Safety Interlocks 1-18
Laser Safety Labels 1-20
Disposal of Laser Vacuum Filters 1-21
Laser Vacuum Filter Replacement Intervals 1-21
Determining Filter Contents 1-21
Filter Handling and Storage 1-22
Room Ventilation 1-22
Electrostatic Discharge (ESD) Precautions 1-23
Handling Devices Safely 1-23
Table of Contents
2 • Set Up
Making the Necessary Connections 2-1
Pneumatic Input and Controls 2-2
Electrical Input 2-3
Applying Power for the First Time 2-4
Setting Up Static Tray Input/Output 2-5
(Optional) Setting Up the Automatic Tray Feeder 2-7
(Optional) Setting Up the Tube Input and Tube Output Modules 2-7
(Optional) Setting Up the Tape Input Feeder 2-10
(Optional) Setting Up the Tape Output System 2-14
(Optional) Setting Up the Label Printing System 2-24
(Optional) Setting Up the Laser Marking System 2-26
3 • Operation
Operator Functions 3-1
Check System Readiness 3-2
Switch On System Power 3-2
Start TaskLink and Load Job 3-2
Configure Input/Output Settings 3-4
Verify Job Information 3-6
Prepare Input/Output Modules 3-8
Run a Job 3-9
Stop the System 3-10
Shut Down the System 3-12
Monitor the Light Tower 3-13
Troubleshoot Programmer Problems 3-13
(Optional) Preselect the Programmers 3-15
(Optional) Change a Socket Adapter 3-17
(Optional) Operate the TF20 Automatic Tray Feeder 3-18
(Optional) Operate the TF30 Automatic Tray Feeder 3-19
Administrator Functions 3-20
Create a Task Using TaskLink 3-20
Teach the Reference Vision File 3-21
Teach the Package File 3-33
Monitor Statistics 3-48
Maximize Programming Yields 3-51
Monitor Daily Operation Logs 3-53
(Optional) Create a Data File from a Master Device 3-54
(Optional) Create a Laser Marking File 3-55
(Optional) Create a Label Printer File 3-63
4 • System Theory
Main Power System 4-1
Circuit Breakers 4-1
I/O Controller 4-1
FlashCORE Programmer 4-2
CPU - PowerPC Controller Board (RPX-Lite) 4-3
Waveform Board 4-3
Backplane Board 4-3
Socket Adapter Board 4-3
Table of Contents
Computer System 4-4
Handler Computer 4-4
User Interface System 4-5
Touch Screen Monitor 4-5
Keyboard and Touchpad 4-5
Light Tower 4-5
Safety Systems 4-5
Emergency Stop and Safety Shield Interlocks 4-5
Pick And Place System 4-6
Gantry System 4-6
Pick And Place Head 4-6
Socket Actuator 4-7
Vision System 4-7
Input and Output Modules 4-8
Tube Input and Output 4-8
Tape Input and Output 4-8
Tray Input and Output 4-9
Label Marking System 4-9
Laser Marking System 4-10
5 • Maintenance
Preventive Maintenance 5-1
Interval Table 5-2
Materials 5-3
Procedures Performed Every Day 5-4
Procedures Performed Every Week 5-4
Procedures Performed Every Month 5-5
Procedures Performed Every Three Months 5-12
Procedures Performed Every Six Months 5-15
Procedures Performed Once a Year 5-23
Laser Computer 5-29
Handler Computer 5-29
Installing AH500 Updates 5-29
Adjustments, Calibrations, and Functional Tests 5-29
Adjusting the Vacuum Sensors 5-30
Adjusting the Blow-Off Pressure 5-36
Adjusting the Socket Actuator Air Pressure 5-37
Adjusting the Socket Actuator Sensors 5-37
Calibrating FlashCORE Programmers 5-41
Calibrating the Vision System 5-41
Replacing Major Assemblies 5-50
Replacing the Pick And Place Head 5-51
Replacing FlashCORE Quad or FlashCORE Assemblies 5-53
Fixing Failures 5-55
Tube Input and Output Problems 5-55
Programmer Errors 5-56
I/O Controller Problems 5-58
Air Pressure Problems 5-59
Servo Motor Problems 5-59