13-21 Production Setup 13.4. Cont. [F4] When the “PCB Download” opera tion has been completed, this button is activated while the placement is not in progress, and it is inac tivated while the placem ent is in progres s.…

13-20
Next Generation, Multi-Functional Placer DECAN S1 Administrator’s Guide
13.3. Stop [F3]
When the “PCB Download” operation has been completed, this button is activated while
the placement is in progress, and it is inactivated while the placement is not in progress.
This submenu transmits the command to stop the placement related to the downloaded
PCB data to the equipment.
Caution Inserting a part of body while the equipment is in operation
or in temporary stop could result in severe injury.
Do not insert a part of body while the equipment is in
operation or in temporary stop.

13-21
Production Setup
13.4. Cont. [F4]
When the “PCB Download” operation has been completed, this button is activated while
the placement is not in progress, and it is inactivated while the placement is in progress.
This command transmits the command to continue the placement related to the
downloaded PCB data at the position where the operation was stopped previously to the
equipment.
The cases that “Cont.” command is not available are as follows:
When a new PCB file is downloaded
When the number of Cycle is changed
When the number of Cycle is changed
“Cont.” command is available is for the following case
When the step data related to head or feeder or nozzle or skip is changed

13-22
Next Generation, Multi-Functional Placer DECAN S1 Administrator’s Guide
13.5. Finish [F5]
This submenu transmits to the equipment the command to completely stop the placement
related to the downloaded PCB data.