NPM-W 2 EJM7DE-CT-01 M-00 -1 Cleaning the touchscreen -2 Cleaning the nozzle holder (3-nozzle head(option)) -3 Cleaning the PCB-support blocks -3-1 Cleaning the PCB-support blocks (Single conveyor specifications) -3-2 Cl…

NPM-W2 EJM7DE-CT-01M-00
S-12
2
Overview
-1
Overview
-1-1
Maintenance overview
-1-2
Periodic inspection items by cycle
-1-3
Periodic inspection items by unit
-1-4
Periodic inspection items by applying grease
-1-5
Consumable parts
-1-6
Periodic inspection points by unit
-1-7
Part exchange due to limited-life
3
Tasks
related to
maintenance
-1
Greasing
-2
How to handle the feeder cart
(feeder cart(option))
-3
Detaching and attaching the feeder
table cover

NPM-W2 EJM7DE-CT-01M-00
-1
Cleaning the touchscreen
-2
Cleaning the nozzle holder
(3-nozzle head(option))
-3
Cleaning the PCB-support blocks
-3-1
Cleaning the PCB-support blocks
(Single conveyor specifications)
-3-2
Cleaning the PCB-support blocks
(Dual conveyor specifications)
-4
Cleaning the cover glass
(multi-recognition camera)
-5
Cleaning the feeder table
(feeder cart,13-slot feeder(option))
-6
Cleaning the table surface
(tray feeder drawer(option))
-7
Cleaning the calibration jig
(2D inspection head(option))
-8
Cleaning and checking the dummy
dispensing plate
(dispensing head(option))
-9
Checking the connector
(feeder cart,13-slot feeder(option))
-1
Before operation
-1-1
Inspecting the pressure gauge
-1-2
Checking the dummy dispensing tape
(dispensing head(option))
-2
After operation
-2-1
Cleaning the components-ejection box
-2-2
Cleaning the used-tape box
(feede
r
cart: and 13-slot feeder(option))
-2-3
Cleaning the refuse box
(tray feeder(option))
-2-4
Cleaning the wiping station (dispensing
head(option))
-2-5
Cleaning and checking the screw unit and the
nozzles (dispensing head(option))
-3
As needed
-3-1
Cleaning an inspecting the pallet
(fray feeder pallet(option))
4
Periodic
inspection
Every-24-
hours
5
Periodic
inspection
Every-140-
hours
S-13

NPM-W2 EJM7DE-CT-01M-00
S-14
6
Periodic
Inspection
Every-560-
hours
-1
Greasing the PCB conveyor
-2
Greasing the XY-axis linear guide
-3
Greasing the nozzle holder
-4
Cleaning the nozzle (option) and the
nozzle changer
(option)
-5
Inspecting PCB/extension
conveyor
(option)
-6
Cleaning the large reflector
(3-nozzle head(option))
-7
Cleaning the vacuum pump filter
-8
Inspecting the safety switches
-9
Cleaning the PCB detection
sensors
-10
Inspecting the vacuum air path
(placement head(option))
-11
Inspecting the θ-axis belt
(placement head(option))
-12
Cleaning the components-ejection
conveyor
(option)
-13
Greasing to the tray feeder (option)
-14
Cleaning the slot
(tray feeder magazine(option))
-15
Cleaning the safety cover
-16
Inspecting the air drain
(regulator unit)
-17
Greasing the cutting unit
-18
Cleaning the light-emitting and
light-receiving sections
(height sensor(option))
-19
Greasing the dispensing head
(option)
-20
Greasing the dummy dispensing
unit
(dispensing head(option))
-21
Cleaning the nozzle (option) and
nozzle changer
(option) for support
pins
-22
Cleaning the XY-axis cable bearer