N7201A617E00_0317 - 第131页
4 Periodic inspection Every-24-hours

NPM-W2 EJM7DE-MB-03M-00
Attaching the feeder table cover 2
3-3-3
9
Attach the feeder
cart
(→P.3-2)
Maintenance
3-3
Detaching and attaching
the feeder table cover 2
7
SERVO
ON
8

4 Periodic inspection
Every-24-hours

NPM-W2 EJM7DE-MB-04M-00
Before
opera-
tion
Inspecting the
pressure gauge 1
Tool used: None Time required: 3 minutes (Machine power ON)
4-1-1-1
Maintenance
4-1-1
Check the air pressure
Describes inspection of the supply pressure.
Front side
Vacuum pump supply
pressure
(-100 to -87 kPa)
Rear side
Main air pressure
(0.500 to 0.505 MPa)
Vacuum break
pressure (8 to12 kPa)
Cleaning blow pressure
(0.13 to 0.14 MPa)
Option air pressure
(0.4 MPa)