N7201A617E00_0317 - 第150页
NPM-W 2 EJM7DE-MB-04 M-00 4-2-5 -7 Attaching the syringe 19 Set the screw unit to the syringe holder After opera- tion Maintenance 4-2-5 Cleaning and c hecking the scr ew unit and the no zzles 4 (dispensing head(option))…

NPM-W2 EJM7DE-MB-04M-00
4-2-5-6
16
17
Blow away
alcohol with an
air blow gun to
dry them
Assemble the screw unit back and check the
condition of cleaned parts
①No clogging in the tip
②No adhesive stuck on the tip
③No adhesive stuck on the
outer surface
④No adhesive stuck on the
reference plane
⑤No bends in the nozzle and
the stopper
●Remaining alcohol will
harden the adhesive.
They should be dried
completely.
To
19
1
2
5
3
4
18
Set the screw unit to the syringe
(Clockwise)
Every
24
hours
PeriodicPeriodic
inspection

NPM-W2 EJM7DE-MB-04M-00
4-2-5-7
Attaching the syringe
19
Set the screw unit to the syringe holder
After
opera-
tion
Maintenance
4-2-5
Cleaning and checking the
screw unit and the nozzles 4
(dispensing head(option))
①Adjust the guide pin of the screw unit to the 9 to 11 o’clock
position. Then insert it into housing.
Housing groove
1
2
②Rotate the screw in the clockwise direction until it stops
rotating.
③Push the syringe in until it hits, with the angle of the flange
adjusted according to the holder direction.
Flange
Guide pin
●By moving it to the 9 to 11 o’clock position in the clockwise
direction, the guide pin is fitted into the groove of the
housing.

NPM-W2 EJM7DE-MB-04M-00
4-2-5-8
20
● Check that the lock plate comes to the lock position.
21
Lock plate
Connect the air
plug
22
Take out the
cloth covered
with the multi-
recognition
camera and the
nozzle changer
23
Rotate the lock plate in the counterclockwise direction, and
lock the syringe
SERVO
ON
24
Every
24
hours
PeriodicPeriodic
inspection