N7201A617E00_0317 - 第16页
NPM-W 2 EJM7DE-CT-01 M-00 S-16 12 Consumable par ts r eplacement -1 Replacing the transfer belt of the PCB transfer convey or -2 Replacing the PCB transfer belt of the extension convey or (Option) -3 Replacing the batter…

NPM-W2 EJM7DE-CT-01M-00
S-15
8
Periodic
inspection
Every-3000-
hours
9
-1
Inspecting the backlight
(touchscreen)
-2
Applying grease to the hinge
(touchscreen)
-3
Inspecting the 1006 nozzle (option)
Periodic
inspection
Every- 6000-
hours
10
Periodic
inspection
Every-
18000-hours
-1
Inspecting the nozzle holder (option)
-2
Inspecting the cable bearer (XY unit)
-3
Replacing the spring
(dispensing head(option))
-4
Replacing the heater/thermocouple
(dispensing head(option))
-1
Cleaning the filter (main controller)
-2
Cleaning the filter of the FA computer
(inspection box(option))
-3
Replacing the O-ring
(dispensing head(option))
-4
Replacing the collar
(dispensing head(option))
-5
Adjusting white balance
(2D inspection head(option))
-1
Cleaning the nozzle holder
(Light weight 16-/12-/8-nozzle head(option))
7
Periodic
inspection
Every-1000-
hours

NPM-W2 EJM7DE-CT-01M-00
S-16
12
Consumable
parts
replacement
-1
Replacing the transfer belt of the
PCB transfer conveyor
-2
Replacing the PCB transfer belt of
the extension conveyor
(Option)
-3
Replacing the batteries
-4
Replacing the dummy dispensing
tape
(dispensing head(option))
-5
Replacing the cushion (wiping
station)
(dispensing head(option))
-6
Replacing the air filter element of
the placement head
(Light weight 16-
nozzle)
-7
Replacing the air filter element of
the placement head
(12-nozzle)
-8
Replacing the air filter element of
the placement head
(8-nozzle)
-9
Replacing the air filter element of
the placement head
(3-nozzle)
Replacement
11
-1
Head and nozzle changer
replacement
-2
A
ttachment without head
-3
Mode switch
-3-1
Switching to the single lane mode
-3-2
Confirming switch

NPM-W2 EJM7DE-CT-01M-00
-1
Overview
-1-1
Calibration performance
-1-2
Calibration item and action
-1-3
Jigs used for calibration
-1-4
Explanation of screen
-2
Head camera XY origin
-3
Plane correction XY
-4
Head / Plane correction Z
-5
Width adjustment
-6
Placement position/Conveyor
-7
Height sensor (option)
-8
Placement load
-8-1
Placement load
-8-2
How to use placement load measurement jig
(option)
-9
Multi-recognition camera
-10
Jig station
-11
Split recognition (option)
-12
Dispensing head
-13
Overview of calibration of 2D
inspection head
-14
White balance (2D inspection head)
-15
Camera offset (2D inspection head)
-16
Image quality correction (2D inspection
head)
-17
Inspection plane correction (2D
inspection head)
-18
Pickup position
-19
Tray
-20
Transfer
-21
Accuracy verification
-21-1
Overview
-21-2
Detailed process
S-17
13
Calibration