N7201A617E00_0317 - 第179页

NPM-W 2 EJM7DE-MB-06M-00 6-1 -2 To 8 Every 560 hours Periodic Periodic Periodic Periodic inspection 7 Apply grease to the linear guides and ball splines Linear guide Linear guide ■ Single conveyor ■ Dual conveyor Linear …

100%1 / 572
NPM-W2 EJM7DE-MB-06M-00
6-1-1
Detach the
feeder cart
(P.3-2)
ENABLING
Confirm there is no
support pins before work.
Maintenance
6-1
Greasing the PCB
conveyor 1
Describes the method for greasing the PCB conveyor.
Tool used: Grease gun, Time required: 20 minutes
Apply grease to the width-adjustment ball screws, linear guides and ball spline of the PCB conveyor.
It describes at the feeder cart side. The tray feeder must be disconnected before work. ( P.14-8)
This work should be performed in the dual lane mode. ( P.11-3-1)
1
5
2
OFF
SERVO
3
4
ENABLING
6
Confirm the
message
Fold the feeder
table cover to
the back
Neither lean against the
feeder table cover nor place
anything on it.
NPM-W2 EJM7DE-MB-06M-00
6-1-2
To
8
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
7
Apply grease to the linear guides and ball splines
Linear guideLinear guide
Single conveyor
Dual conveyor
Linear guide
Linear guide
Apply grease directly the linear guide rail.
Grease: LCG100
NPM-W2 EJM7DE-MB-06M-00
6-1-3
Greasing the PCB
conveyor 2
Maintenance
6-1
Grease nipple
8
Apply grease to the width-adjustment ball
screw from grease nipple
Apply grease via each grease nipple (on the movable rail) with the grease gun.
(2 locations on each lane) (about 0.9 cm
3
per pump)
Grease: LCG100
Width-
adjustment
ball screw
Width-
adjustment
ball screw
Single conveyor
Dual conveyor
Width-
adjustment
ball screw
Width-
adjustment
ball screw