N7201A617E00_0317 - 第202页

NPM-W 2 EJM7DE-MB-06M-00 Maintenance 6-5 Inspecting PCB/e xtension con v eyor (option) 2 8 11 9 10 SERVO ON Return the feeder table cover back Attach the feeder cart ( → P.3-2) 6-5 -3

100%1 / 572
NPM-W2 EJM7DE-MB-06M-00
6-5-2
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
Belt
Movable side
Fixed side
Movable side
Fixed side
Movable side
Fixed side
Lane 1
Lane 2
7
Single conveyor
Dual conveyor
To
8
Check the belt
Motor pulley
Rotate the belt in the motor pulley (indicated by the arrow), and
replace it if you find scratch, adhesion of dust, wear-out or
warn out or scuffing on it.
Eight belts on each lane for dual conveyor, eight belts for
single conveyor. (See the figure below)
Motor pulley positionMotor pulley position
Belt positionBelt position
NPM-W2 EJM7DE-MB-06M-00
Maintenance
6-5
Inspecting PCB/extension
conveyor
(option) 2
8
11
9 10
SERVO
ON
Return the
feeder table
cover back
Attach the
feeder cart
(P.3-2)
6-5-3
NPM-W2 EJM7DE-MB-06M-00
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
6-5-4
Inspecting the extension conveyor belt
Explains an inspecting method when an extension conveyor is installed to the downstream process.
Tool used: Belt tension meter Time required: 5 minutes for single conveyor, 10 minutes for dual conveyor
7
Belt
To
in
P. 6 - 5 - 3
8
6
Movable side
Fixed side
Movable side
Fixed side
Movable side
Fixed side
Single conveyor
Dual conveyor
Check the belt
Lane 1
Lane 2
From
in
P.6-5-1
Motor pulley
It describes how to work at the front side based on the premise of the front reference.
For the rear reference, detach the tray feeder and work at the rear side.
The inspection procedure is the same as the PCB conveyor except step . Follow the procedure of the
PCB conveyor for the process before and after step .
Motor pulley position
Belt position
Motor pulley position
Belt position
Rotate the belt in the motor pulley (indicated by the arrow), and
replace it if you find scratch, adhesion of dust, wear-out or
warn out or scuffing on it.
Two belts on each lane for dual conveyor, two belts for single
conveyor. (See the figure below)