N7201A617E00_0317 - 第246页
NPM-W 2 EJM7DE-MB-06M-00 6-22 -3

NPM-W2 EJM7DE-MB-06M-00
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
6-22-2
Clean the cable bear on the X-axis
4
●Move the placement head in the X-
direction and wipe off any adhesion on the
cable bear using a lint free cloth.
●Move the placement head to the right and
wipe off any dust on the bracket using a
lint free cloth.
5
Clean the cable bear on the Y-axis
●Move the X-axis beam in the Y-direction
and wipe off any adhesion on the cable
bear using a lint free cloth.
●Push the X-axis beam inward and wipe off
any dust on the bracket using a lint free
cloth.
Bracket
Bracket

NPM-W2 EJM7DE-MB-06M-00
6-22-3

7 Periodic inspection
Every-1000-hours