N7201A617E00_0317 - 第344页

NPM-W 2 EJM7DE-MB-13M-00 Over- view Maintenance 13-1-1 Calibr a tion perf or mance To maximize the machine’s capability, you need to adj ust parameters installed on the machine to the site environment. This task is calle…

100%1 / 572
13 Calibration
NPM-W2 EJM7DE-MB-13M-00
Over-
view
Maintenance
13-1-1
Calibration
performance
To maximize the machine’s capability, you need to adjust parameters installed on the machine to the site
environment. This task is called calibration.
Chapter 12 describes the calibration method.
Do this task if any of the following events should occur;
Relocation of the machine.
Replacement of unit(s).
Floor level change.
Observe the following conditions as you perform the task.
Turn ON the main power switch of the machine at least one hour before you start the task.
Do not warm up the machine before you start the task.
Wait for over an hour to start the task, immediately after the machine stops production or warm-up
operation.
13-1-1-1
NPM-W2 EJM7DE-MB-13M-00
13-1-1-2
Calibration