N7201A617E00_0317 - 第358页

NPM-W 2 EJM7DE-MB-13 M-00 Plane cor r ection XY 3 18 13-3 -5 Prepare for removing the plane correction jig Maintenance 13-3 Open the safety cover 19 20 Push the plane correction jig out of the machine by hand through the…

100%1 / 572
NPM-W2 EJM7DE-MB-13M-00
13-3-4
16
Confirm that it has been
successfully completed
16
17
Confirm the message
(The plane correction XY data is saved)
17
Calibration
When you do not save the data
To cancel
(The screen remains as it is
in )
16
NPM-W2 EJM7DE-MB-13M-00
Plane correction XY 3
18
13-3-5
Prepare for removing the plane
correction jig
Maintenance
13-3
Open the safety cover
19
20
Push the plane correction jig
out of the machine by hand
through the left-hand or right-
hand transfer conveyor.
21
22
Close the safety cover
23
24
24
(Completes plane correction XY
operation)
Confirm the message
To cancel
(The screen remains as it is
in )
16
Servo switch OFF
Servo switch ON
NPM-W2 EJM7DE-MB-13M-00
13-3-6
Calibration