N7201A617E00_0317 - 第358页
NPM-W 2 EJM7DE-MB-13 M-00 Plane cor r ection XY 3 18 13-3 -5 Prepare for removing the plane correction jig Maintenance 13-3 Open the safety cover 19 20 Push the plane correction jig out of the machine by hand through the…

NPM-W2 EJM7DE-MB-13M-00
13-3-4
16
Confirm that it has been
successfully completed
16
17
Confirm the message
(The plane correction XY data is saved)
17
Calibration
●When you do not save the data
●To cancel
(The screen remains as it is
in )
16

NPM-W2 EJM7DE-MB-13M-00
Plane correction XY 3
18
13-3-5
Prepare for removing the plane
correction jig
Maintenance
13-3
Open the safety cover
19
20
Push the plane correction jig
out of the machine by hand
through the left-hand or right-
hand transfer conveyor.
21
22
Close the safety cover
23
24
24
(Completes plane correction XY
operation)
Confirm the message
●To cancel
(The screen remains as it is
in )
16
Servo switch OFF
Servo switch ON

NPM-W2 EJM7DE-MB-13M-00
13-3-6
Calibration