N7201A617E00_0317 - 第384页
NPM-W 2 EJM7DE-MB-13M-00 Place- ment load Placement load 1 The operation p rocedure is applicable onl y to the 3 -nozzle head. 13-8-1 -1 Maintenance 13-8-1 Choose a table ● Choose a table to calibrate. 2 1 3 + Servo swit…

NPM-W2 EJM7DE-MB-13M-00
13-7-6
Calibration

NPM-W2 EJM7DE-MB-13M-00
Place-
ment
load
Placement load 1
The operation procedure is applicable only to the 3-nozzle head.
13-8-1-1
Maintenance
13-8-1
Choose a table
●Choose a table to calibrate.
2 13
+
Servo switch OFF
Open the safety cover
Prepare to remove a jig
1
2
3
6
5
4
(The width is adjusted)
(The head moves to the retraction position)

NPM-W2 EJM7DE-MB-13M-00
13-8-1-2
Calibration
7
Set the mount load
measurement jig
●Place the jig against the reference
side of the rail, and set it so that the
right edge of the jig is aligned with the
end face of the conveyor’s PCB clamp.
Mount load
measurement jig
* The left figure is based on front reference.
Even if it is based on rear reference, the mount
load measurement jig faces in the same direction
as seen from the front of the machine.
8
Set the power code to any
connector of the feeder cart’s
power supply section
Power supply
section
Prevent the wire from interfering with the head.
(Pass it through the nozzle changer and the
cable carrier)
Load cell meter
Upper rail
Front
Mount load
measurement jig
9
10
Close the safety cover
Servo switch ON