N7201A617E00_0317 - 第423页

NPM-W 2 EJM7DE-MB-13M-00 Confirm that it has been successfully completed, and choose the other head positions for plane correction Z and then repeat steps from to . 7 Confirm that it has been successfully completed + 8 3…

100%1 / 572
NPM-W2 EJM7DE-MB-13M-00
Dispensing head 1
Install the screw unit that a calibration nozzle (nozzle no. 7202) is previously set, and fill up adhesives by
Eject Confirm in advance. ([Operating procedure] P.3-4)
13-12-1
Maintenance
13-12
1
1
2
Choose a table
2
3
Choose a head position
3
5
4
Choose whether dummy
dispensing enables or not
4
+
5
6
Confirm the message
+
(Calibration is carried out)
6
NPM-W2 EJM7DE-MB-13M-00
Confirm that it has been
successfully completed, and
choose the other head
positions for plane correction
Z and then repeat steps from
to .
7
Confirm that it has been
successfully completed
+
8
3 7
9
13-12-2
(Calibration is carried out)
(The confirmation scree of data save
appears)
7
8
9
10
Confirm the message
7
10
(The data obtained by calibration is
saved)
Calibration
NPM-W2 EJM7DE-MB-13M-00
13-12-3
Maintenance
13-12
Dispensing head 2
11
+
11
13
14
Open the safety cover
12
18
+
Confirm the message
18
15
16
17
Remove nozzles
Close the safety cover
19
+
Confirm the message
19
Confirm the message
(The head moves to the work position)
Prepare to remove nozzles
Servo switch ON
Servo switch OFF