N7201A617E00_0317 - 第441页
NPM-W 2 EJM7DE-MB-13M-00 13-17 -2 Calibration

NPM-W2 EJM7DE-MB-13M-00
Inspection plane
correction
(2D inspection head)
13-17-1
Maintenance
13-17
This operation is calibration for the inspection head.
Because the plate correction jig will be manually installed, adjust the transport conveyor width on the pre/post
process machines to the plane correction jig width.
●Remove all support pins before calibration.
●This operation must perform together with plane correction XY in STEP 1.
●After this, the same procedure in
STEP 1, Plane correction XY 1
(→P.13-3) applies.
+
+
1
2
+
3
+
4
Check that there are no PCBs
and support pins present
inside the machine
●If ‘error’ message appears, remove all
the PCBs remaining inside the machine,
and try again.
(The conveyor width is adjusted to the
plane correction jig width)
Confirm the message
(The head moves to the retraction
position.)
Confirm the message
(Press the button to start measurement)
2
1
3
4

NPM-W2 EJM7DE-MB-13M-00
13-17-2
Calibration

NPM-W2 EJM7DE-MB-13M-00
Pickup position 1
Explains the operation procedure, taking for an example, the 12-nozzle head; however, the same
procedure can also be applied to the light weight 16-, 8-, and 3-nozzle heads.
Remove the feeders from the slots indicated in the following conditions beforehand;
●For a feeder cart: No. 1, 2, 3, 14, 15, 16, 28, 29, 30
●For 13-slot feeder: No. 18, 19, 20, 23, 24, 25, 28, 29, 30
2
Choose a table
●Choose the table for calibration.
+
2
3
1
13-18-1
3
1
Maintenance
13-18
(The head moves to the working
position.)