N7201A617E00_0317 - 第458页

NPM-W 2 EJM7DE-MB-13 M-00 13-20 -3 T r ansf er 2 Maintenance 13-20 Confirm that it has been successfully completed 12 11 14 15 12 T o check parameters (Transitions to the screen of ) 13 14 13 Check transfer position offs…

100%1 / 572
NPM-W2 EJM7DE-MB-13M-00
13-20-2
Calibration
6
5
7
9
8
Head
type
Nozzle
position
Nozzle
type
3 2nd 1003
10
10
To cancel
(The screen remains as it is
in )
1
Confirm the message
+
Open the safety cover
Install nozzles
Nozzle used
Servo switch OFF
Close the safety cover
Servo switch ON
(Calibration is carried out)
NPM-W2 EJM7DE-MB-13M-00
13-20-3
Transfer 2
Maintenance
13-20
Confirm that it has been
successfully completed
12
11
14
15
12
To check parameters
(Transitions to the screen of )
13
14
13
Check transfer position
offset
13
15
(Transitions to the screen of )
11
16
16
11
To cancel
(The screen remains as it is
in )
11
Confirm the message
+
(The head moves to the working
position.)
NPM-W2 EJM7DE-MB-13M-00
13-20-4
Calibration
17
19
20
22
21
23
23
18
To cancel
(The screen remains as it is
in )
11
Confirm the message
+
Open the safety cover
Remove nozzles
Close the safety cover
Prepare to remove nozzles
Servo switch ON
Servo switch OFF