N7201A617E00_0317 - 第486页
NPM-W 2 EJM7DE-MB-13M-00 Production preparation 1 (Loadi ng MCDA T A: Production program) Maintenance 13-21-2 13-21-2 -17 Accuracy verifica- tion Detailed pr ocess 9 (dispensing head) 2 1 Set the SD card which MCDA T A h…

NPM-W2 EJM7DE-MB-13M-00
13-21-2-16
Calibration

NPM-W2 EJM7DE-MB-13M-00
Production preparation 1 (Loading MCDATA: Production program)
Maintenance
13-21-2
13-21-2-17
Accuracy
verifica-
tion
Detailed process 9
(dispensing head)
2
1
Set the SD card which MCDATA
has been copied
3
●Load the data as same way as the
normal production data.
4
Choose MCDATA
Load MCDATA
2
3
(→ P.13-21-1-10 ‘■MCDATA type’)

NPM-W2 EJM7DE-MB-13M-00
Production preparation 2 (preparation for verification material 2)
1
Prepare a syringe and a screw unit
(→See [Operating
procedure] P.3-4)
●Set the nozzle for
calibration on the screw
unit.
2
Prepare the dispensing accuracy
check board (N610114660AA)
●Wipe the board surface
using a cloth soaked in
ethanol, and spray the
anti-static agent.
WARNING
Individuals with pacemakers, etc. should keep away from the linear motor
(Risk of accidents caused by errors in operation due to magnetic force)
13-21-2-18
Calibration