N7201A617E00_0317 - 第488页
NPM-W 2 EJM7DE-MB-13 M-00 Accuracy verifica- tion Dispending check and reflection (dispending) ENABLING 3 2 1 (First layer) (Second laye r) 13-21-2 -19 Detailed pr ocess 10 (dispensing head) Maintenance 13-21-2 6 Load a …

NPM-W2 EJM7DE-MB-13M-00
Production preparation 2 (preparation for verification material 2)
1
Prepare a syringe and a screw unit
(→See [Operating
procedure] P.3-4)
●Set the nozzle for
calibration on the screw
unit.
2
Prepare the dispensing accuracy
check board (N610114660AA)
●Wipe the board surface
using a cloth soaked in
ethanol, and spray the
anti-static agent.
WARNING
Individuals with pacemakers, etc. should keep away from the linear motor
(Risk of accidents caused by errors in operation due to magnetic force)
13-21-2-18
Calibration

NPM-W2 EJM7DE-MB-13M-00
Accuracy
verifica-
tion
Dispending check and reflection (dispending)
ENABLING
321
(First layer)
(Second layer)
13-21-2-19
Detailed process 10
(dispensing head)
Maintenance
13-21-2
6
Load a PCB
●Production starts after the
PCB is loaded upon
completion of production
preparation.
4
8
7
Do not press the STOP button
while accuracy verification is
carried out.
You cannot restart operation in
the middle of accuracy
verification.
NOTICE
Confirm the
message
ENABLING
5
●To use accuracy verification
MCDATA:
(→ P.13-21-1
-1 ‘■Reflection
of verification data’)
●The screen for head
camera appears and you
can see a dispensing
shape.

NPM-W2 EJM7DE-MB-13M-00
13-21-2-20
Calibration
Checking and reflection of dispensing (checking dispensing results)
1
After dispensing completion
2
(Automatic operation is complete)
+
3
4
5
2
3
4 5
Choose a table
(Front or rear (individual) or total
accuracy is displayed.)