N7201A617E00_0317 - 第496页
NPM-W 2 EJM7DE-MB-14M-00 1 080 2 332 1 080 4 492 14-3 -1 Temporarily locate the machine along the baseline drawn on the floor and adjust the in stallation position. ● Adjust the height and facing of the machine to guaran…

NPM-W2 EJM7DE-MB-14M-00
Transportation
14-2
Maintenance
14-2
Using a forklift or a pallet truck
Keep turning the Adjustment bolt’s adjustment bolt until
the bottom of the machine is raised higher than the forks.
Insert the forks under the machine from the right side
●Align the center of two forks to ▼ shown on the sticker.
Raise the forks and lift the machine.
Convey the machine to the destination and set it down.
Tool used: 46 mm spanner (2 pcs)
■Fork insertion position
●Insert the forks from the side
Using a crane
1
3
4
Installation
Pallet truck or forklift
Fork insertion position
Forks
Lock nut
Adjustment bolt
Right side
Front side
2
MASS: 2 470 kg
CENTER
Please consult a specialized delivery company.
Eye bolts
(four)
●Use eyebolts for fixing the machine to a cart or others. An angle
θ that the fixing rope makes with a horizontal line should be 45
degrees or less.
●Do not use eyebolts to lift the machine.
●Store eyebolts after transport.
ATTENTION
θ
Fixing rope
Cart
Carefully handle the machine during transportation. When any of the feeder cart, tray feeder, cable or pipe is
connected to the main unit, remove it before transportation.
In addition, for the machine with the extension conveyor installed, the cable attached to the conveyor must be
removed from the machine to prevent it from getting stuck by the fork.

NPM-W2 EJM7DE-MB-14M-00
1 080
2 332
1 080
4 492
14-3-1
Temporarily locate the machine along the baseline
drawn on the floor and adjust the installation position.
●Adjust the height and facing of the machine to
guarantee a smooth PCB transfer between the
machine and adjacent equipment in a line.
●Keep a 1 to 5 mm space between the machine
and adjacent equipment.
●If running a vent under the machine, keep a 40
mm or more space between the machine and the
vent.
(The figure on the right shows the minimum space
and is measured in millimeters (mm))
2
Check the working area
Working area
1 080
1 830
Tool used: Convex, Allen wrench (3 mm), metal ruler, Level gauge, 46 mm spanners (2 pcs)
Feeder
cart
Feeder cart
Installation 1
Maintenance
14-3
1 080
1 830
Working area
Front side
Front side: Feeder cart/ Rear side: Feeder cart
Front side Rear side
To
(P.14-3-4)
3
●Regarding installation, follow the instructions of
a specialist.
●Regarding relocation, contact us, please.
NOTICE
1
Install
Coverendface
Coverendface
Cover end
face
Cover end
face

NPM-W2 EJM7DE-MB-14M-00
2 3321 080 855
4 267
14-3-2
2
Check the working area
Single tray feeder
(Option)
Feeder cart
855
2 000
Working area
Front side
Front side Rear side
Working area
1 080
1 830
To
(P.14-3-4)
3
1
Install
Temporarily locate the machine along the
baseline drawn on the floor and adjust the
installation position.
●Adjust the height and facing of the machine
to guarantee a smooth PCB transfer
between the machine and adjacent
equipment.
●Keep a 1 to 5 mm space between the
machine and adjacent equipment.
●If running a vent under the machine, keep a
40 mm or more space between the machine
and the vent.
(The figure on the right shows the minimum
space and is measured in millimeters (mm))
Front side: Feeder cart/ Rear side: Single tray feeder + Fixed supply unit
Coverendface
Coverendface
Installation
●Regarding installation, follow the instructions of
a specialist.
●Regarding relocation, contact us, please.
NOTICE
Cover end
face
Cover end
face