N7201A653E - 第117页

NPM- TT2 EJM1EE-MB-04 M-00 4-1-1 -4 Every 24 hours Periodic Periodic inspection

100%1 / 502
NPM-TT2 EJM1EE-MB-04M-00
Before
opera-
tion
Rear side
4-1-1-3
Maintenance
4-1-1
Check the air pressure (Main air pressure)
Tool used: Allen wrench (3 mm) Time required: 3 minutes
Adjust when the main air pressure is out of the required value range.
Inspecting the
pressure gauge 2
1
Remove the screws and remove
the rear pressure gauge cover
2
Adjust the pressure to be
within the range
Main air
regulator knob
How to operate the regulator knob
1: Pull the knob up
2: Adjust it
3: Pull it down
3
Attach the rear pressure
gauge cover
Screw: Three locations
Screw: Three
locations
Remove screws
Rear
pressure
gauge cover
NPM-TT2 EJM1EE-MB-04M-00
4-1-1-4
Every
24
hours
PeriodicPeriodic
inspection
NPM-TT2 EJM1EE-MB-04M-00
4-1-1-5
Adjusting the air pressure (pressure of cleaning blow , Option air pressure and vacuum break )
Tool used: Phillips screwdriver (No.2), spanner (10 mm) Time required: 20 minutes
If cleaning blow pressure, Option air pressure and vacuum break pressure are out of prescribed value,
adjust them.
Before
opera-
tion
Maintenance
4-1-1
Inspecting the
pressure gauge 3
1
Adjust the pressure to be
within the range
4
Regulator knob
Cleaning blow regulator
knob
How to use the regulator knob
1: Pull the knob up
2: Adjust it
3: Pull it down
(For cleaning blow pressure)
Vacuum break
pressure regulator
knob
Lock nut
When the vacuum break regulator
is adjusted, loosen the lock nut.
After adjusted, tighten the nut.
Detach the tray
feeder or the
feeder cart
For a tray feeder
( P.14-8)
For a feeder cart
( P.3-2)
Cleanblowpressure
(0.13 to 0.14 MPa)
Optionairpressure
(0.4MPa)
Vacuum break
pressure
(8 to 12 kPa)