N7201A653E - 第118页
NPM- TT2 EJM1EE-MB-04 M-00 4-1-1 -5 Adjusting the air pressure (pressure of cleaning blow , Option air pressure and vacuum break ) Tool used: Phillips sc rewdriver (No.2) , spanner (10 mm) Time required: 20 minutes ● If …

NPM-TT2 EJM1EE-MB-04M-00
4-1-1-4
Every
24
hours
PeriodicPeriodic
inspection

NPM-TT2 EJM1EE-MB-04M-00
4-1-1-5
Adjusting the air pressure (pressure of cleaning blow , Option air pressure and vacuum break )
Tool used: Phillips screwdriver (No.2), spanner (10 mm) Time required: 20 minutes
●If cleaning blow pressure, Option air pressure and vacuum break pressure are out of prescribed value,
adjust them.
Before
opera-
tion
Maintenance
4-1-1
Inspecting the
pressure gauge 3
1
Adjust the pressure to be
within the range
4
Regulator knob
Cleaning blow regulator
knob
● How to use the regulator knob
1: Pull the knob up
2: Adjust it
3: Pull it down
(For cleaning blow pressure)
Vacuum break
pressure regulator
knob
Lock nut
●When the vacuum break regulator
is adjusted, loosen the lock nut.
After adjusted, tighten the nut.
Detach the tray
feeder or the
feeder cart
●For a tray feeder
(→ P.14-8)
●For a feeder cart
(→ P.3-2)
Cleanblowpressure
(0.13 to 0.14 MPa)
Optionairpressure
(0.4MPa)
Vacuum break
pressure
(8 to 12 kPa)

NPM-TT2 EJM1EE-MB-04M-00
Front side
Remove the cover
inside of the cart
■Image as seen from the
arrow direction
2
4-1-1-6
●Screw: Four locations
●Remove screws
Cover
3
Turn ON the
main power
switch
5
Attach the cover in
the main unit
6
Attach the tray
feeder or the
feeder cart
Front side
Cover
●For a tray feeder
(→ P.14-8)
●For a feeder cart
(→ P.3-2)
Every
24
hours
PeriodicPeriodic
inspection
ON