N7201A653E - 第148页

EJM1EJ-MB-06 M-02 NPM- TT2 6-1 -1 1 Apply grease to the linear guides and ball splines 3 ● Confirm there is no support pins befor e work. Gr easing the PCB con v ey or 1 Describes the method for greasing the PCB con veyo…

100%1 / 502
6 Periodic inspection
Every-560- hours
EJM1EJ-MB-06M-02NPM-TT2
6-1-1
1
Apply grease to the linear guides and ball splines
3
Confirm there is no
support pins before work.
Greasing the PCB
conveyor 1
Describes the method for greasing the PCB conveyor.
Tool used: Grease gun, Time required: 25 minutes
Apply grease to the width-adjustment ball screws and linear guides of the PCB conveyor.
We recommend you to work in dual lane mode. (→ P.11-2-1)
2
Detach the tray
feeder or the
feeder cart
For a tray feeder
(→ P.14-8)
For a feeder cart
(→ P.3-2)
Linear guide
Linear guide
Ball spline
Ball spline
For a linear guide rail
Apply grease directly the linear guide rail.
Grease: LCG100
For a ball spline
Apply grease directly the center of the ball spline.
Grease: LCG100
Maintenance
6-1
ACTIVATION
EJM1EJ-MB-06M-02NPM-TT2
Grease nipple
4
Apply grease to the width-adjustment ball
screw from grease nipple
Apply grease via each grease nipple (on the movable rail) with the grease gun.
(2 locations on each lane) (about 0.9 cm
3
per pump)
Grease: LCG100
6-1-2
To
5
Width-
adjustment
ball screw
Width-
adjustment
ball screw
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection