N7201A653E - 第15页

NPM- TT2 EJM1EE-CT-01 M-02 S-15 8 -1 Cleaning the filter (main controller) -2 Cleaning the filter of the F A computer (LNB(option)) 9 -1 Inspecting the backlight (touchscreen) -2 Applying grease to the hinge (touchscreen…

100%1 / 502
NPM-TT2 EJM1EE-CT-01M-02
S-14
6
Periodic
inspection
Every-560-
hours
-1
Greasing the PCB conveyor
-2
Greasing the XY-axis linear
guide
-3
Greasing the nozzle holder
(8-nozzle head (option))
-4
Cleaning the nozzle (option) and
the nozzle changer
(option)
-5
Inspecting the PCB/extension
conveyor
(option)
-6
Cleaning the large reflector
(3-nozzle head (option))
-7
Cleaning the vacuum pump filter
-8
Inspecting the safety switches
-9
Cleaning the PCB detection
sensors
-10
Inspecting the vacuum air path
(Placement head (option))
-11
Inspecting the θ-axis belt
(8-nozzle head (option))
-12
Cleaning the components-
ejection conveyor
(option)
-13
Greasing to the tray feeder
(option)
-14
Cleaning the slot
(tray feeder magazine (option))
-15
Cleaning the safety cover
-16
Inspecting the air drain
(regulator unit)
-17
Greasing the cutting unit
-18
Cleaning the nozzle (option) and
nozzle changer
(option) for
support pins
-19
Cleaning the light-emitting and
light-receiving sections
(height sensor (option))
-20
Cleaning the XY-axis cable
bearer
NPM-TT2 EJM1EE-CT-01M-02
S-15
8
-1
Cleaning the filter
(main controller)
-2
Cleaning the filter of the FA
computer
(LNB(option))
9
-1
Inspecting the backlight
(touchscreen)
-2
Applying grease to the hinge
(touchscreen)
-3
Inspecting the 1006 nozzle
(
option)
-1
Inspecting the nozzle holder
(
option)
-2
Inspecting the cable bearer
(XY unit)
11
-1
Head and nozzle changer
replacement
-2
Mode switch
-2-1
Switching to the single lane mode
-2-2
Confirming switch
Periodic
inspection
Every-3000-
hours
Periodic
inspection
Every- 6000-
hours
Periodic
inspection
Every-
18000-hours
Replacement
-1
Cleaning the nozzle holder
(8-nozzle head (option))
Periodic
inspection
Every-1000-
hours
10
7
NPM-TT2 EJM1EE-CT-01M-02
S-16
13
Calibration
-1
Overview
-1-1
Calibration performance
-1-2
Calibration item and action
-1-3
Jigs used for calibration
-1-4
Explanation of screen
-2
Head camera XY origin
-3
Plane calibration XY
-3-1
Plane calibration XY
(PC size conveyor)
-3-2
Plane calibration XY
(M size conveyor)
-4
Head/Plane calibration Z
-5
Width adjustment
-6
Placement position/Conveyor
-7
Height sensor (option)
-8
Placement load
-8-1
Placement load
-8-2
How to use placement load measurement
jig (option)
-9
Multi-recognition camera
-10
Jig station
-11
Split recognition
-12
Pickup position
-13
Tray
-14
Transfer
-15
Accuracy verification
-15-1
Overview
-15-2
Detailed process
12
Consumable
parts
replacement
-1
Replacing the transfer belt of the
PCB transfer conveyor
-2
Replacing the transfer belt of the
extension conveyor
(option)
-3
Replacing the batteries
-4
Replacing the air filter element of
the placement head
(Light weight 8-
nozzle head)
-5
Replacing the air filter element of
the placement head
(8-nozzle head)
-6
Replacing the air filter element of
the placement head
(3-nozzle head V2)
-7
Replacing the air filter element of
the placement head
(3-nozzle head)