N7201A653E - 第174页

EJM1EJ-MB-06 M-02 NPM- TT2 6-6 -1 3 4 1 2 ACTIVATION Describes how to clean the large reflector. Tool used: L int free cloth Time required: 15 minutes ● Leaving the large reflector dirty results in an recogn ition err or…

100%1 / 502
EJM1EJ-MB-06M-02NPM-TT2
6-5-6
Inspecting the belt tension of the PCB conveyor
Enter the following numerical values to the frequency measuring instrument (Acoustic belt tension meter
provided by a belt manufacturer) in advance. Flicking your fingers at the center section (P shown in the
drawings below) of each span, measure the natural frequency with the frequency measuring instrument.
Input value
Adjust and fix the tension pulley if the measurement value falls under the prescribed value.
Belt unit mass 0.7 g/m
Belt width 4.5 mm
Span length See below
Prescribed value
Standby section (upstream/downstream in common) :2 rails on each
Lane 1
Lane 2
Standby section
Lane 1 430 to 470 Hz
Lane 2 430 to 470 Hz
Tension pulley
Tension pulley
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
94 mm
P
94 mm
P
EJM1EJ-MB-06M-02NPM-TT2
6-6-1
3
4
1
2
ACTIVATION
Describes how to clean the large reflector.
Tool used: Lint free cloth Time required: 15 minutes
Leaving the large reflector dirty results in an recognition error.
Cleaning the large
reflector
(3-nozzle head (option))
Maintenance
6-6
Pull the nozzle out and
down.
Wipe the large
reflector with a
clean lint free
cloth
Large reflector
For the rear side,
Remove the
nozzle from the
placement head
ACTIVATION
EJM1EJ-MB-06M-02NPM-TT2
6-6-2
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection