N7201A653E - 第210页

EJM1EJ-MB-06 M-02 NPM-TT2 6-20 -3

100%1 / 502
EJM1EJ-MB-06M-02NPM-TT2
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
6-20-2
Clean the cable bear on the X-axis
4
Move the placement head in the X-
direction and wipe off any adhesion on the
cable bear using a lint free cloth.
Move the placement head to the right and
wipe off any dust on the bracket using a
lint free cloth.
5
Clean the cable bear on the Y-axis
Move the X-axis beam in the Y-direction
and wipe off any adhesion on the cable
bear using a lint free cloth.
Push the X-axis beam inward and wipe off
any dust on the bracket using a lint free
cloth.
Bracket
Bracket
EJM1EJ-MB-06M-02NPM-TT2
6-20-3
7 Periodic inspection
Every-1000-hours