N7201A653E - 第273页
NPM- TT2 EJM1EE-MB -12M-04 12-1 -4 10 Secure the plate ● Six screws Plate ■ Figure as seen from the arrow direction Plate Side B Side A ● Push the plate to the step on Side A and install it to be paralleled to Side B. Ad…

NPM-TT2 EJM1EE-MB-12M-04
Replacing the transfer belt of
the PCB transfer conveyor 2
Maintenance
12-1
12-1-3
9
A
B
●Loosen screws of the tension pulley in advance. (Three on each)
Tension pulley
Tension pulley
Tension pulley Tension pulley
●About the front and rear sides of the belt
Front side: No letter printed
Rear side: Letters are printed
●Install the belt so the belt front side shall be the PCB transfer side.
■6 belts on each lane
Lane 1
Lane 2
Hook a new belt
No. Belt length [mm] Product No.
1050 MTNK002604AA
1980 MTNK002584AA
A A
B
A A
B

NPM-TT2 EJM1EE-MB-12M-04
12-1-4
10
Secure the plate
●Six screws
Plate
■Figure as seen from the arrow direction
Plate
Side B Side A
●Push the plate to the step on Side A and
install it to be paralleled to Side B.
Adjust the belt
tension
(→ P.6-5)
Consumable parts
replacement
●Two
Screws:
M4
Attach the
feeder table
cover (→P.3-3)
To
14
Attach the tray
feeder or the
feeder cart
●For a tray feeder
(→ P.14-8)
●For a feeder cart
(→ P.3-2)
11
12
13

NPM-TT2 EJM1EE-MB-12M-04
Replacing the transfer belt of
the PCB transfer conveyor 3
Maintenance
12-1
12-1-5
Check the PCB
transfer
(→[Operating Procedure]
P.5-2-8)
Unlock the
machine and
ON
14
15