N7201A653E - 第316页

NPM- TT2 EJ M1EE-MB-13M-0 2 Plane calibratio n XY 18 Prepare for removing the plane calibration jig Maintenance 13-3-1 Open the safety cover 19 20 Push the plane calibration jig out of the machine by hand through the lef…

100%1 / 502
NPM-TT2 EJM1EE-MB-13M-02
16
Confirm that it has been
successfully completed
16
Calibration
17
Confirm the message
(The plane calibration XY data is saved)
When you do not save the data
To cancel
(The screen remains as it is
in )
16
17
13-3-1-4
NPM-TT2 EJM1EE-MB-13M-02
Plane
calibratio
n XY
18
Prepare for removing the plane
calibration jig
Maintenance
13-3-1
Open the safety cover
19
20
Push the plane calibration jig
out of the machine by hand
through the left-hand or right-
hand transfer conveyor.
21
22
Close the safety cover
23
24
24
(Completes plane calibration XY
operation)
Confirm the message
To cancel
(The screen remains as it is
in )
16
Servo switch OFF
Servo switch ON
13-3-1-5
Plane calibration XY
(PC size conveyor) 3
NPM-TT2 EJM1EE-MB-13M-02
Calibration
13-3-1-6