N7201A653E - 第316页
NPM- TT2 EJ M1EE-MB-13M-0 2 Plane calibratio n XY 18 Prepare for removing the plane calibration jig Maintenance 13-3-1 Open the safety cover 19 20 Push the plane calibration jig out of the machine by hand through the lef…

NPM-TT2 EJM1EE-MB-13M-02
16
Confirm that it has been
successfully completed
16
Calibration
17
Confirm the message
(The plane calibration XY data is saved)
●When you do not save the data
●To cancel
(The screen remains as it is
in )
16
17
13-3-1-4

NPM-TT2 EJM1EE-MB-13M-02
Plane
calibratio
n XY
18
Prepare for removing the plane
calibration jig
Maintenance
13-3-1
Open the safety cover
19
20
Push the plane calibration jig
out of the machine by hand
through the left-hand or right-
hand transfer conveyor.
21
22
Close the safety cover
23
24
24
(Completes plane calibration XY
operation)
Confirm the message
●To cancel
(The screen remains as it is
in )
16
Servo switch OFF
Servo switch ON
13-3-1-5
Plane calibration XY
(PC size conveyor) 3

NPM-TT2 EJM1EE-MB-13M-02
Calibration
13-3-1-6