N7201A653E - 第323页
NPM- TT2 EJM1EE-MB-13 M-02 Calibration 13-3-2 -6

NPM-TT2 EJM1EE-MB-13M-02
Plane
calibratio
n XY
18
Prepare for removing the plane
calibration jig
Maintenance
13-3-2
Open the safety cover
19
20
Push the plane calibration jig
out of the machine by hand
through the left-hand or right-
hand transfer conveyor.
21
22
Close the safety cover
23
24
24
(Completes plane calibration XY
operation)
Confirm the message
●To cancel
(The screen remains as it is
in )
16
Servo switch OFF
Servo switch ON
13-3-2-5
Plane calibration XY
(M size conveyor) 3

NPM-TT2 EJM1EE-MB-13M-02
Calibration
13-3-2-6

NPM-TT2 EJM1EE-MB-13M-02
2
Head / Plane calibration
Z 1
Choose a head for calibration
+
(The head moves to the work position)
2
Explains the method for calibrating the head / plane calibration Z, taking for an example, the 8-nozzle head;
however, the same method can also be applied to the 3-nozzle heads.
Placement head 1
3
4
1
4
13-4-1
1
3
Choose nozzle positions to
measure the height
●On the default screen, all the nozzle
positions are selected. If there is a
nozzle position which you do not wish
to calibrate, deselect it by pressing its
box.
or
Maintenance
13-4