N7201A653E - 第325页
NPM- TT2 EJ M1EE-MB-13M-0 2 5 6 Open the safety cover Prepare for height measurement 7 Install nozzles to the nozzle positions selected in step 8 3 10 Close the safety cover 9 11 (The height measurement is co mpleted) + …

NPM-TT2 EJM1EE-MB-13M-02
2
Head / Plane calibration
Z 1
Choose a head for calibration
+
(The head moves to the work position)
2
Explains the method for calibrating the head / plane calibration Z, taking for an example, the 8-nozzle head;
however, the same method can also be applied to the 3-nozzle heads.
Placement head 1
3
4
1
4
13-4-1
1
3
Choose nozzle positions to
measure the height
●On the default screen, all the nozzle
positions are selected. If there is a
nozzle position which you do not wish
to calibrate, deselect it by pressing its
box.
or
Maintenance
13-4

NPM-TT2 EJM1EE-MB-13M-02
5
6
Open the safety cover
Prepare for height
measurement
7
Install nozzles to the nozzle
positions selected in step
8
3
10
Close the safety cover
9
11
(The height measurement is completed)
+
Confirm the message
●To cancel
(The screen remains as it is in )
3
11
13-4-2
●Nozzle used
Head type Nozzle type
8 230C
3 1002
Calibration
Servo switch OFF
Servo switch ON

NPM-TT2 EJM1EE-MB-13M-02
12
Confirm that it has been
successfully completed
●If it has been successfully completed,
the display of each nozzle position is
changed from '-' to 'OK'.
(The head moves to the work position)
12
+
Placement head 2
13-4-3
Head / Plane calibration
Z 2
13
Prepare for plane calibration Z
14
Open the safety cover
15
16
Check the nozzle installation
positions
●Nozzle used
Head
type
Nozzle
position
Nozzle
type
8 No. 3 230C
3 No. 2 1002
Maintenance
13-4
Servo switch OFF