N7201A653E - 第345页

NPM- TT2 EJM1EE-MB-13 M-02 7 Set the Placement load measurement jig ● Place the jig aga inst t he refere nce side of the rail, and set it so that the right edge of the jig is aligned with the end face of the conveyor’s P…

100%1 / 502
NPM-TT2 EJM1EE-MB-13M-02
Place-
ment
load
Placement load 1
Choose a table
Choose a table to calibrate.
2
1
Placement load calibration is required for 3-nozzle head only.
If you cannot set a Placement load measurement jig, manually load the PCB from the pre-process
machine and set the jig using the workbench (please prepare yourself).
Do not turn OFF the power of the machine during calibration.
2
13-8-1-1
13
+
3
Maintenance
13-8-1
(The width is adjusted)
(The head moves to the retraction
position)
6
Open the safety cover
5
4
Prepare for installing the jig
Servo switch OFF
NPM-TT2 EJM1EE-MB-13M-02
7
Set the Placement load
measurement jig
Place the jig against the reference
side of the rail, and set it so that the
right edge of the jig is aligned with the
end face of the conveyor’s PCB clamp.
If you cannot set a Placement load
measurement jig, manually load the
PCB from the pre-process machine
and set the jig using the workbench
(please prepare yourself).
Placement load
measurement jig
8
Set the power code to any
connector of the feeder cart’s
power supply section
Power supply
section
Prevent the wire from interfering with the head.
(Pass it through the nozzle changer and the
cable carrier)
Load cell meter
Upper rail
Front
13-8-1-2
Placement load
measurement jig
Calibration
9
10
Close the safety cover
Servo switch ON
NPM-TT2 EJM1EE-MB-13M-02
Place-
ment
load
11
13-8-1-3
Placement load 2
+
11
Confirm the message
To cancel
(The screen remains as it is in )
1
(Each time you press it, the nozzle
position № changes)
Choose the position to perform
calibration.
+
12
12
13
13
Maintenance
13-8-1
15
16
Open the safety cover
(The head moves to the work position)
14
Prepare to install nozzles
Servo switch OFF