N7201A653E - 第397页

NPM- TT2 EJ M1EE-MB-13M-0 2 13-14 -2 Calibration 6 5 7 9 8 Head type Nozzle position Nozzle type 3 2nd 1003 10 10 ■ To cancel (The screen remains as it is in ) 1 Confirm the message + Open the safety cover Install nozzle…

100%1 / 502
NPM-TT2 EJM1EE-MB-13M-02
13-14-1
Maintenance
13-14
1
2
4
1
2
3
3
Choose a table
Choose the table for calibration.
To cancel
(The screen remains as it is
in )
1
Confirm the message
+
(The head moves to the working
position.)
Prepare to install the nozzle
Transfer 1
This operation is calibration in the transfer unit.
Information on the relative position for the head height and the transfer stage forming flax is required to
transfer flax to the component. Performing this calibration allows measuring and registering transfer
position offset to calculate the above relative position. If the transfer unit is removed/installed, the transfer
position offset may be varied. Therefore, perform this calibration and register transfer position offset.
If the transfer unit is not installed, this operation is not available.
This is applied for the 3-nozzle head.
NPM-TT2 EJM1EE-MB-13M-02
13-14-2
Calibration
6
5
7
9
8
Head
type
Nozzle
position
Nozzle
type
3 2nd 1003
10
10
To cancel
(The screen remains as it is
in )
1
Confirm the message
+
Open the safety cover
Install nozzles
Nozzle used
Servo switch OFF
Close the safety cover
Servo switch ON
(Calibration is carried out)
NPM-TT2 EJM1EE-MB-13M-02
13-14-3
Maintenance
13-14
Confirm that it has been
successfully completed
12
11
14
15
12
14
13
13
15
16
16
11
To cancel
(The screen remains as it is
in )
11
Confirm the message
+
(The head moves to the working
position.)
Transfer 2
To check parameters
(Transitions to the screen of )
13
Check transfer position
offset
(Transitions to the screen of )
11