N7201A653E - 第80页

NPM- TT2 EJM1EE-MB-02 M-01 Overview P eriodic inspection items by unit 1 No. Unit name Check and grea sing location Check and grease points Cycle [h] Ref. 24 140 560 1000 3000 6000 18000 1 Main body unit Main air pressur…

100%1 / 502
NPM-TT2 EJM1EE-MB-02M-01
2-1-2-6
Every-18000-hours (every 3 years) inspection items
Types in common
8-nozzle head (Option)
3-nozzle head (Option)
No. Unit Check and greasing location Power
Check and
greasing points
Time
[min]
Ref.
1 XY unit Cable bearer OFF Check 5 10-2
No. Unit Check and greasing location Power
Check and
greasing points
Time
[min]
Ref.
1
Nozzle holder
(per head)
Clamp claw
OFF Check 10 10-1Spring for holding clamp claws
Spring for nozzle cushion
No. Unit Check and greasing location Power
Check and
greasing points
Time
[min]
Ref.
1
Nozzle holder
(per head)
Clamp claw
OFF Check 10 10-1
Spring for holding clamp claws
Inspection time (min) = 5
Inspection time (min) = 10 x (the number of heads)
Inspection time (min) = 10 x (the number of heads)
Overview
Every-6000-hours (yearly) inspection items
3-nozzle head (Option)
Types in common
No. Unit Check and greasing location Power
Check and
greasing points
Time
[min]
Ref.
1 Touchscreen
Backlight
ON
Check 2 9-1
Hinge (Front and rear sides)
Grease dispensing
(TOUCH LUBE)
59-2
No. Unit Check and greasing location Power
Check and
greasing points
Time
[min]
Ref.
1 Nozzle 1006 nozzle OFF Check 1 9-3
Inspection time (min) = 7
Inspection time (min) = 1 x (the number of nozzles)
NPM-TT2 EJM1EE-MB-02M-01
Overview
Periodic inspection
items by unit 1
No. Unit name
Check and greasing
location
Check and
grease
points
Cycle [h]
Ref.
24 140 560 1000 3000 6000 18000
1
Main body
unit
Main air pressure
(Pressure gauge)
Air
pressure
check
4-1-1
Vacuum pump supply
pressure
(Pressure gauge)
Vacuum break pressure
(Pressure gauge)
Clean blow pressure
(Pressure gauge)
Components-ejection box
Cleaning
4-2-1
Vacuum pump filter
6-7
Emergency stop switch
Check
6-8
Tray connection safety
switch
6-8
Air drain (Regulator)
6-16
2 XY unit
X-,Y- axis linear guide
Apply
grease
6-2
X-,Y- axis Cable bearer Cleaning
6-20
X-,Y- axis Cable bearer Check
10-2
3
PCB
conveyor
PCB-support blocks Cleaning
5-3
Linear guide
Grease
dispensing
6-1
Ball spline
6-1
Width-adjustment ball
screw
Apply
grease
6-1
PCB transfer belt Check
6-5
PCB detection sensor Cleaning
6-9
4 Cover
Safety switch Check
6-8
Safety cover Cleaning
6-15
5
Touchscree
n
Color touchscreen face Cleaning
5-1
Backlight Check
9-1
Hinge
Grease
dispensing
9-2
6
Multi-
recognition
camera
Cover glass Cleaning
5-4
7
Main
controller
Filter Cleaning
8-1
8
13-slot
feeder
Inside of the
used-tape box
Cleaning
4-2-2
Feeder table
5-5
Cutting unit
Apply
grease
6-17
Connector Check
5-7
2-1-3-1
Maintenance
2-1-3
The lists below show check and grease locations, information, and cycles organized by unit.
Types in common
NPM-TT2 EJM1EE-MB-02M-01
2-1-3-2
8-nozzle head (option)
No. Unit name
Check and greasing
location
Check and
grease
points
Cycle [h]
Ref.
24 140 560 1000 3000 6000 18000
1
Placement
head
Vacuum air path
Check
6-10
Θ-axis belt
6-11
2 Nozzle holder
Spring for nozzle
cushion
Cleaning
7-1
Spring for nozzle
cushion
Check
10-1
Spring for holding clamp
claws
Cleaning
7-1
Spring for holding clamp
claws
Grease
dispensing
6-3
Spring for holding clamp
claws
Check
10-1
Clamp claw Cleaning
7-1
Clamp claw
Grease
dispensing
6-3
Clamp claw Check
10-1
Inner and outer
circumferences
Cleaning
7-1
Filter Cleaning
Taper surface Cleaning
Nozzle holder shaft Cleaning
Nozzle holder slicing
surface
Cleaning
Grease
dispensing
3 Nozzle
Nozzle taper surface Cleaning
6-4
Nozzle reflector Cleaning
Nozzle tip Cleaning
Nozzle inside Cleaning
Nozzle flange upper
surface
(2D code area)
Cleaning
4
Nozzle
changer
Nozzle reflector contact
surface
Cleaning
Overview