MAN00000772_SI-G200BB_SVCPDFA - 第142页
System software clear installation process WKGB-10109-01 8. ASM Software Setup scree n appears. Keep it until installation is completed. 9. Information screen appear s. Click OK button. 10. The installation is completed.…

System software clear installation process
WKGB-10109-01
System software clear installation process
10/11
6. User Information screen appears. Input required information to click Next> button.
7. Setup Type screen appears. Click Next> button.

System software clear installation process
WKGB-10109-01
8. ASM Software Setup screen appears. Keep it until installation is completed.
9. Information screen appears. Click OK button.
10. The installation is completed.
System software clear installation process
11/11

Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 1/8
SI-G200 AA BB SH terminals separation to prevent ground relay
Take off SH terminal from machine frame and covers to insulate with plastic tape. After insulation fix
SH lines to prevent interfering during production.
CONTENTS
[Required equipments]...............................................................................................................................2
1. Before work...........................................................................................................................................2
2. Taking off SH terminals of feed cover ................................................................................................ 4
3. Taking off SH terminals of X-Y relay .................................................................................................5
4. Taking off SH terminals of upper frame ............................................................................................7
5. Return back original condition............................................................................................................8
Before After