MAN00000772_SI-G200BB_SVCPDFA - 第145页
O pe r a ti on Guide W o rk Pr ocess Parts R e placem ent Maintenan ce I ntended i tem S I -G200 A A BB Docume n t no. W KGB- 2 0105-0 1 Page 3/8 Loosen 8 C P 3 x 6 to tak e off head c o nn ector co ver o f f ron t si de…

Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 2/8
[Required equipments]
Hexagon wrench
Nipper
Nylon tie (AB 150, AB 100)
Screw driver (Plus)
Screw driver plus, with short length (See photo.)
Plastic tape
Screw driver plus, with short length
1. Before work
Power off machine.
Loosen 2 CP 4 x 45 from machine inside shown as photo, to take
off top plate which is on machine both sides.
Power off switch
Main breaker

Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 3/8
Loosen 8 CP 3 x 6 to take off head connector cover of front side.
Take off head connector cover of rear side as same way.
Loosen 4 CP 4 x 15 to move tower light position from side
sealing to machine top center. It is not requires to take off the
connector which connects tower light and machine.
Loosen 2 CP4 x 8 to shift side sealing position by 10 mm to machine outside.
Now preparation is completed.
Machine Front Left Machine Front Right

Operation Guide Work Process Parts Replacement Maintenance
Intended item SI-G200 AA BB
Document no. WKGB-20105-01
Page 4/8
2. Taking off SH terminals of feed cover
Loosen 2 P4 x 6 to take off SH terminal on feed cover. After taking off SH terminals fix 2 P4 x 6
and tooth lock washers.
Wrap SH Terminal with plastic tape to fix nylon tie
This process should be done for front and rear side.
Work spot Enlarged
Enlarged (completed)