MAN00000772_SI-G200BB_SVCPDFA - 第155页

Preparation for Calibration HLGB-10101-01 Install the Calibration Plate Jig SHEET 1/3 Inst all the Calibration Plate Jig Operations to use the cal ibration plate jig are as fol lows. When perfor ming the following operat…

100%1 / 712
CLGB-10106-01
SI-G200BB Service Manual
"Console Operation Procedure
Contents"
SHEET
2/2
Pickup Position Setup................................................................. HLGB-10311-01
Checking Pickup Position ........................................................... HLGB-10312-01
Mount Accuracy Calibration........................................................ HLGB-10313-01
XY Axis Software Limit Setup ..................................................... HLGB-10314-01
Conveyor Width Adjustment ....................................................... HLGB-10315-01
Measuring Parallelism of Reference Pin and Dependent Pin ..... HLGB-10316-01
Parts Discard Position Adjustment.............................................. HLGB-10317-01
2-4 Adjustment
Matching of X Axis Z-Phase ....................................................... HLGB-10401-01
Matching of Y Axis Z-Phase........................................................ HLGB-10402-01
H Axis Gear Z-phase Matching................................................... HLGB-10403-01
Adjustment of H Axis Upper End OT Sensor (H-CCW) .............. HLGB-10404-01
Adjustment of H axis Lower End OT Sensor (H-CW) ................. HLGB-10405-01
FF/FR Axis Z-Phase Matching.................................................... HLGB-10406-01
Adjustment of FF/FR Axis Belt Tension ...................................... HLGB-10407-01
Adjustment of RTF/RTR Axis Belt Tension ................................. HLGB-10408-01
Adjustment of RNF/RNR Axis Belt Tension ................................ HLGB-10409-01
Gap Adjustment for Head Unit Mechanical Valve and Plunger ... HLGB-10410-01
Adjustment of Plunger Upper/Lower Backward Detect Sensor .. HLGB-10411-01
Nozzle Height Adjustment .......................................................... HLGB-10412-01
Nozzle Escape Detect Sensor Position Adjustment ................... HLGB-10413-01
Phase Adjustment for Nozzle ..................................................... HLGB-10414-01
Nozzle Sensor Adjustment ......................................................... HLGB-10415-01
Adjustment of PWB Sensor ........................................................ HLGB-10416-01
Adjustment of Cassette Float Sensor Height.............................. HLGB-10417-01
Adjustment of PWB Stopper Sensor........................................... HLGB-10418-01
Fixed Camera Pickup Check Sensor Adjustment ....................... HLGB-10419-01
Area Sensor Light Axis Adjustment............................................. HLGB-10420-01
Ejector Setup.............................................................................. HLGB-10421-01
Blow Flow rate Setup.................................................................. HLGB-10422-02
Vacuum Pump Sensor Setup ..................................................... HLGB-10423-01
Supplied Air Sensor Setup.......................................................... HLGB-10424-01
Adjustment and checking of H-axis software limit....................... HLGB-10425-01
Preparation for Calibration
HLGB-10101-01
Install the Calibration Plate Jig
SHEET
1/3
Install the Calibration Plate Jig
Operations to use the calibration plate jig are as follows.
When performing the following operations, install the calibration plate jig according to the procedure
described in this section.
Set-Up
• RT Axis Origin Position Setup
Acquiring Mounting Stroke Setup
• PWB Camera Setup
• Fiducial Mark Setup
Calibration
• PWB Camera Light Calibration
• Fixed Camera Calibration
• Pickup Camera Calibration
[Necessary jigs]
Calibration plate jig
Jig positioning pin
[Procedure]
1 Set conveyor width to 186mm.
1. Click in an order of MANUAL menu
PWB TRANSPORT tab Conv. Wid.
Adj. button.
Calibration plate jig
Jig positioning pin
Preparation for Calibration
HLGB-10101-01
Install the Calibration Plate Jig
SHEET
2/3
2. Click the Abs. Move button on the
Conv. Adj. screen.
3. Input “186” into the input box of the
Conv. Width Abs. Pos.
4. Press the [START] button on the
operation panel.
Conveyor width is widened to the position of 186
mm.
2 Press the emergency stop button to turn
OFF the servo.
3 Remove the lower cover and shooter on the
front of the unit.
1. Loosen screw (2-+T4x8) to remove the
lower cover.
Tile the lower cover slightly toward you and
pull the fan cable to remove the lower panel.
2. Loosen screw (2-+T4x8) to remove the
shooter.
4 Install the calibration plate jig.
1. Place the calibration plate jig on the
rail on the right of the conveyor and
slide it to near the center of the
conveyor.
2. Insert the jig positioning pins (two)
into the calibration plate jig.
3. Remove the cap screw for jig
positioning pin.
If the cap screw for the jig positioning pin is
forgotten to be pulled out, it may interfere
with the head, causing damage on the unit.
Calibration plate jig
Lower cover
Shooter