MAN00000772_SI-G200BB_SVCPDFA - 第330页
Adjustment HLGB-10414-01 Phase A djustment for Nozzle SHEET 5/7 3. Put a pull-out jig on the upper part of the spline nut and pull the small gear quietly to move. 4. Change the directi on of the small gear so that positi…

Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
4/7
6 Loosen the set screws (2-H2.5x4) fixing the
small gear for the turret No.1.
Do not remove the set screw fixing the small
gear. Otherwise, the set shoe may fall.
7 Release emergency stop to return the unit to
the origin.
1. Turn the emergency stop switch to
release emergency stop.
2. Click the [ORG] button to return the
system to the original position.
8 Again move the head to a position where
working can be easily performed.
9 Operate the turret RT axis screen to move
the turret No.1 toward you.
10 Adjust the direction of the set screw for the
small gear.
1. Click in an order of MANUAL menu
AXIS MOTION tab.
AXIS MOTION screen is displayed.
2. Check that current position of the RN
axis is 0°.
Emergency stop
switch
ORG button
Set screw
Small gear

Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
5/7
3. Put a pull-out jig on the upper part of
the spline nut and pull the small gear
quietly to move.
4. Change the direction of the small gear
so that position of the set screw on the
left of the small gear is on the front
toward you.
5. Quietly lower the small gear from the
pull-out jig and move it to the spline
nut.
11 Adjust the phase.
1. Insert the inner shaft temporarily.
Pay attention to phases of the inner shaft and
the spline nut.
2. Turn the inner shaft so that the
marking (scribing line) on the inner
shaft is directed to the front.
3. Install a phase adjusting jig (1) with
cap screws (2-CP3x14).
4. Install the phase adjusting jig (2) at
the lower side of the inner shaft.
Pull-out jig
Small gear
Inner shaft
Phase adjusting jig (2)
Phase adjusting jig (1)

Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
6/7
5. Turn the inner shaft and the phase
adjusting jig (2) to lightly press them
against the phase adjusting jig (1).
Now check that the marking on the inner shaft
is directed toward you.
6. Check that current position of the RN
axis is 0° on the axis operation screen.
7. Tighten the sect screw (left) for the
small gear to 15[cN・m].
Check that the small gear is as high as the large
gear.
8. Remove the phase adjusting jig (1) and
phase adjusting jig (2) from the head.
9. Remove the inner shaft and the
pull-out jig from the head.
Phase adjusting jig (2)
Phase adjusting jig (1)
Set screw (Left)
Phase adjusting
jig (2)
Phase adjusting
jig (1)
Pull-out jig Inner shaft