Adjustment HLGB-10414-01 Phase A djustment for Nozzle SHEET 7/7 10. Click the R.H button on the AXIS MOTION screen. 11. Click the Abs. Move button on the RN/H-axis screen. 12. Click the RN-Axis button and in put “120” in…

Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
6/7
5. Turn the inner shaft and the phase
adjusting jig (2) to lightly press them
against the phase adjusting jig (1).
Now check that the marking on the inner shaft
is directed toward you.
6. Check that current position of the RN
axis is 0° on the axis operation screen.
7. Tighten the sect screw (left) for the
small gear to 15[cN・m].
Check that the small gear is as high as the large
gear.
8. Remove the phase adjusting jig (1) and
phase adjusting jig (2) from the head.
9. Remove the inner shaft and the
pull-out jig from the head.
Phase adjusting jig (2)
Phase adjusting jig (1)
Set screw (Left)
Phase adjusting
jig (2)
Phase adjusting
jig (1)
Pull-out jig Inner shaft

Adjustment
HLGB-10414-01
Phase Adjustment for Nozzle
SHEET
7/7
10. Click the R.H button on the AXIS
MOTION screen.
11. Click the Abs. Move button on the
RN/H-axis screen.
12. Click the RN-Axis button and input
“120” into the input space.
13. Press the [START] button on the
operation panel.
The RN axis absolute-moves to a position of
120°.
14. Click the Return button to close the
RN/H axis screen.
15. Tighten the sect screw (right) for the
small gear to 15[cN・m].
12 Install the spring and the spring holder to the
inner shaft.
13 Tighten the cap screws (2-CP3x10) to
40[cN・m] and install the mechanical valve.
Tighten 2-CP3x10 for fixing mechanical valve on
the upper and lower sides alternately little by
little.
14 Turn on the VACUUM breaker.
Set screw (Right)
Spring holder
Spring
Mechanical valve

Adjustment
HLGB-10415-01
Nozzle Sensor Adjustment
SHEET
1/7
Nozzle Sensor Adjustment
[Necessary jigs]
A Jig nozzle for nozzle changer
B Nozzle (used in production)
C Scale (about 300 mm)
[Adjust the sensor attachment height]
1 Remove all nozzles from the head.
Do not execute the automatic replacement of
the nozzle when the teaching of the nozzle
changer has not been completed.
2 Move the head clear of the work area.
1. Click in an order of MANUAL menu
AXIS MOTION tab XY button.
XY Axis screen is displayed.
A
B
C
Remove all nozzles from the head.