00195323-0102_SM_CP20_FS02to FS03_DE EN - 第25页

在线预览 00195323-0102_SM_CP20_FS02to FS03_DE EN PDF 文档。

100%1 / 26
Service Manual: Hoses for C&P20 placement head FS02 upgraded to FS03 on SIPLACE X-series
08/2006 Edition
24
Fig. 2.8 - 2 C&P20 for compressed air or vacuum
: Attach the Ø 8 mm hose to the pressure control valve.
: Attach the Ø 6 mm hose to the return cylinder.
2