00198711-01_UM_X-Serie-S_EN.pdf - 第101页
Instruction manual SIPLACE X-Series 3 Technical data and assemblies From software version 713.0 Edition 11/2019 3.1 Performance data 101 3 T echnical dat a and assemblies 3.1 Performance dat a 3.1.1 Definition of placeme…
2 Operational safety Instruction manual SIPLACE X-Series S
2.10 ESD guidelines From software version 713.0 Edition 11/2019
100

Instruction manual SIPLACE X-Series 3 Technical data and assemblies
From software version 713.0 Edition 11/2019 3.1 Performance data
101
3 Technical data and assemblies
3.1 Performance data
3.1.1 Definition of placement performance
The placement performance is influenced by the different head combinations and head positions,
plus the conveyor configurations. Individual options and customized applications also influence
the placement performance. On request, SIPLACE can calculate the actual performance of your
product on your machine configuration.
IPC value [components/h]
According to the vendor-neutral conditions of the IPC 9850 standard published by the Association
of Connecting Electronics Industries.
SIPLACE benchmark value [components/h]
The SIPLACE benchmark value is measured during the machine acceptance tests. It corresponds
to the conditions set out in the SIPLACE scope of service and supply.

3 Technical data and assemblies Instruction manual SIPLACE X-Series
3.1 Performance data From software version 713.0 Edition 11/2019
102
3.1.2 Machine performance SIPLACE X4i S
3
Placement head types SIPLACE SpeedStar (C&P20 P)
SIPLACE SpeedStar (C&P20 P2)
SIPLACE MultiStar (CPP)
SIPLACE TwinStar (TH)
Definition of placement performance
For a definition of placement performance values, see the note on page 101.
SIPLACE X4i S
Placement performance
For a definition of placement performance values, see the note on page 101.
Placement
machine
Placement area 1 Placement area 2 IPC value Benchmark
value
X4i S-A C&P20 P / C&P20 P C&P20 P / C&P20 P 125,000 150,000
C&P20 P / C&P20 P CPP_L/CPP_L 102,000 120,000
C&P20 P / C&P20 P CPP_H / CPP_H 100,300 118,000
C&P20 P2 / C&P20 P2 C&P20 P2/C&P20 P2 146,000 172,000
C&P20 P2/C&P20 P2 CPP_L/CPP_L 112,950 133,000
C&P20 P2 / C&P20 P2 CPP_H / CPP_H 107,000 126,000
CPP_L/CPP_L CPP_L/CPP_L 79,900 94,000
CPP_L/CPP_L CPP_H / CPP_H 73,950 87,000
CPP_H / CPP_H CPP_H / CPP_H 68,000 80,000
X4i S-B C&P20 P / C&P20 P CPP_H/TH 85,000 101,500
C&P20 P2 / C&P20 P2 CPP_H/TH 94,675 111,500
CPP_L/CPP_L CPP_H/TH 61,625 72,500
CPP_H / CPP_H CPP_H/TH 55,675 65,500
X4i S-C C&P20 P / C&P20 P TH / TH 70,900 85,000
C&P20 P2 / C&P20 P2 TH / TH 81,350 97,000
CPP_L/CPP_L TH / TH 49,300 58,000
CPP_H / CPP_H TH / TH 43,350 51,000
CPP_H = SIPLACE Multistar CPP in high assembly position
CPP_L = SIPLACE Multistar CPP in low assembly position