ASM贴片机CPP头半年保养 - 第4页
Table of Contents

Equipment required for CPP head maintenance (6-monthly)
1 Mount the CPP head
2 Dismantle the front plate
3 Remove the holding circuit
4 Exchange / maintain the PRV
5 Lubricate the Z-axis support roller
6 Clean / lubricate the Z-axis linear guide
7 Clean / lubricate the DP segment guide
8 Clean / lubricate the DP drive bearing
9 Check / replace the hoses at DP drives
10 Clean the DP light barrier
11 Mount the holding circuit
12 Clean the holding circuit housing and replace / mount the silencer
13 Clean / mount the screwed joint
14 Mount the front plate
15 Lubricate the star bearing
16 Replace the filter discs
17 Mount the PRV
18 Clean the component sensor
19 Finish the head maintenance
20 Appendix: Maintain the holding circuit
21 Appendix: Maintain the Pressure Regulator Valve (PRV)
22 Appendix: Prepare the multipette
23 Appendix: Clean-up the multipette
Table of Contents

Table of Contents

Equipment required for CPP head maintenance (6-monthly)
Main sub units CPP head
1. Star bearing
2. Segment
3. Pressure regulator valve
4. Front plate
5. Silencer
6. Linear guide for Z drive
7. Component sensor (on the underside of the head)