00191376-07 - 第23页

HS Preventive Maintenance 4 W eekly maintenance jobs 01/2006 US Edition 23 4 4 Y ou wil l need the following tools and consuma bles for the wee kly mainte nance jobs. 4 – V a cuum cl eaner (w ith app ropriat e nozzle ) –…

100%1 / 86
4 Weekly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
22
4 Weekly maintenance jobs
4
HS Preventive Maintenance 4 Weekly maintenance jobs
01/2006 US Edition
23
4
4
You will need the following tools and consumables for the weekly maintenance jobs. 4
Vacuum cleaner (with appropriate nozzle)
–Waste bin
–Brush
–Scissors
Lint-free cloths
Ethyl alcohol
Set of cleaned ceramic nozzles or new nozzles
Filter mat 230x360 for the air filter box, if required.
4
There must be no PCBs in the machine during the following maintenance steps. 4
: Select “Block manually” (status closed) on the station computer and click on OK (for dual con-
veyor track 1 / track 2).
Wait until the last PCB is finished and has left the machine.
The working area is now clear. 4
: Press the Stop button.
: Open the protective cover.
4
4
To move the gantry, take hold of the C&P head handle and push gently and carefully. 4
4
: Push the gantry over the component table. This will stop it outside your working area.
4
Vacuum PCB conveyor / sonar sensors (sonar sensors on the HS-50 only) 4
a Vacuum the sonar sensor (HS-50) thoroughly.
s Use a suitable vacuum cleaner nozzle to remove loose components from the sonar sensor unit
(HS-50 only).
d Use the vacuum cleaner to remove all loose components on and around the PCB conveyor.
Loose components on the PCB conveyor and in the sonar sensor unit could cause faults. 4
4
4
4 Weekly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
24
4