00191376-07 - 第41页

HS Preventive Maintenance 6 2-monthly m aintenance jobs 01/2006 US Edition 41 a Preserve th e feeder area using a lint-free cloth s prayed with WD40. s V acu um up a ny loo se comp onents from t he tape con tainer an d r…

100%1 / 86
6 2-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
40
6
HS Preventive Maintenance 6 2-monthly maintenance jobs
01/2006 US Edition
41
a Preserve the feeder area using a lint-free cloth sprayed with WD40.
s Vacuum up any loose components from the tape container and remove any unwanted stickers
and adhesive tape.
6
d Cut off the excess used tape flush with the feeder and empty the component drawer or the
component flap on 8 mm S feeders.
: Return the feeders to the feeder area.
Make sure that each feeder is in the correct location and is connected correctly. 6
6
6
6
6
6
: Close the protective cover.
: Switch the placement machine on at the main switch.
: Repeat these tasks in every placement area.
6
6
6
6
6
6
7 4-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
42
7 4-monthly maintenance jobs
7.1 Structure of the 12-segment Collect&Place heads
DLM1 (HS-50) and DLM 2 (HS-60)
7
Fig. 7.1 - 1 12-segment Collect&Place heads
7
7
7
7
7
7
7
7
DLM 1
DLM 2