00191376-07 - 第43页

HS Preventive Maintenance 7 4-monthly m aintenance jobs 01/2006 US Edition 43 7 Y ou wil l need the following tools, eq uipmen t and cons umables for the 4-m onthly ma intena nce. 7 –P l i e r s – Sho rt-b rist led br us…

100%1 / 86
7 4-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
42
7 4-monthly maintenance jobs
7.1 Structure of the 12-segment Collect&Place heads
DLM1 (HS-50) and DLM 2 (HS-60)
7
Fig. 7.1 - 1 12-segment Collect&Place heads
7
7
7
7
7
7
7
7
DLM 1
DLM 2
HS Preventive Maintenance 7 4-monthly maintenance jobs
01/2006 US Edition
43
7
You will need the following tools, equipment and consumables for the 4-monthly maintenance. 7
–Pliers
Short-bristled brush
Set of hexagon socket spanners
Lint-free cloths
Lint-free cottonwool buds
Ethyl alcohol
ISOFLEX TOPAS NCA52 grease
UNISILKON L250L
Oil dispenser with Structovis GHD (DLM1)
New distributor plate, if required (DLM 1)
New Z axis toothed belt, if required
New distributor, if required
New O-ring, turning station, if required
New toothed belt for the turning station, if required.
Set of cleaned sleeves
Set of clean valve plungers
7
7
7
7
7
7
7 4-monthly maintenance jobs HS Preventive Maintenance
01/2006 US Edition
44
7