User Manual SIPLACE Head Care Station - - 第56页

5 Working with the HCS 5.2 Head verification process 56 User Manual SIPLACE Head Care Station 10/2017 Fig.48: Removing the cover Connections at the back: ► Grab the knob (1) and pull the protective cover (2) with the …

100%1 / 76
5 Working with the HCS
5.2 Head verification process
User Manual SIPLACE Head Care Station 10/2017 55
NOTICE
Calibration nozzle
For the head verification, the head must be equipped with calibration nozzles.
Fig.45: Inserting the stopper
Insert the correct stopper(1).
 NOTICE!
The tool clamping(2) has two different ver-
sions: The new tool locking using a spring,
the former tool locking using a screw.
.
Fig.46: Mounting the head
Fasten the screws to the head mounting
board(1) with a torque of 2.7Nm.
 NOTICE!
The screw holes to be used for the various
heads are indicated on the board.
.
Fig.47: Connecting the cables
Connections at the front:
Connect the flat ribbon cable(2) to the board ad-
apter head interface(1).
Connect the camera cables(3) to the respective
camera interface (4).
5 Working with the HCS
5.2 Head verification process
56 User Manual SIPLACE Head Care Station 10/2017
Fig.48: Removing the cover
Connections at the back:
Grab the knob(1) and pull the protective
cover(2) with the actuator(3) upwards out of the
safety switch(4).
Fig.49: Connecting the flat ribbon cablesr
Connect the flat ribbon cables(3) of the Board
Adapter-LP C700B-HCSII[03087842-xx](1) to
the Board Adapter-LP CPP/CP20-HC-
SII[03087843-xx](2).
Fig.50: Setting the voltage
For C&P20x heads, set the switch(1) to 40V.
For CPP heads, set the switch(1) to 150V.
5 Working with the HCS
5.2 Head verification process
User Manual SIPLACE Head Care Station 10/2017 57
Fig.51: Refitting the cover
Fit the cover back on.
Make sure that the actuator snaps back into the
safety switch(1).
Fig.52: Connecting the hoses
Connect the hose for compressed air supply or
vacuum to the head top(1).
Connect the hose for compressed air supply to
the pressure regulator valve (PRV)(3).
Connect the hose(2) for the exhaust air to the
head.
For information on the correct pneumatic connections,
see 3.1.6.2 "Pneumatic connections for the
heads" [}41].
Fig.53: Opening the valves
Open the main valve for the compressed air sup-
ply(1) at the back of the head unit.
Open the respective valves(2) for the com-
pressed air supply to the head.
If required, open the valve(3) for the vacuum
supply to the head.
 CAUTION!
Risk of injury due to loose pneumatic hoses!
Always ensure the valves of the pneumatic con-
nections for the heads are closed before switch-
ing on the main valve for compressed air.
.
For information on the correct pneumatic connections,
see 3.1.6.2 "Pneumatic connections for the
heads" [}41].