EN 3.pdf - 第166页
Model DECAN Series Company SAMSUNG TECHWIN Module 3.1 1 HEAD V ersion 01 Tit le HEAD BLOW & V ACUUM SETTING (F2) Page 3-1 1-6 Note V acuum setting while the nozzle is not mounted. 1. Select <Sys. Setup> → <…

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
HEAD BLOW & VACUUM SETTING (F2)
Page
3-11-5
Note
Valve Check
1. Select Gantry1 and click on <Valve Check>.
2. Enter 50 for <Count> and when <Gantry1 Spindle All> is on, click on <Test> to check.
3. Take necessary actions depending on the test result as follows.
Green: normal / Yellow: observe / Red: abnormal, replace.
A head with yellow/red lights should be checked 100 more times.
4. Remove the nozzle from Head1~10.
5. Check the same thing for Gantry2's Head 11~20.

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
HEAD BLOW & VACUUM SETTING (F2)
Page
3-11-6
Note
Vacuum setting while the nozzle is not mounted.
1. Select <Sys. Setup> → <Head Information>→ <Head> → <Gantry1>.
2. Click on <Set Nozzle Va cuum>. When the head does not have a nozzle, set the air pressure level and
click on Update.
*Vacuum Level should be 60mmHg ~ 120mmHg.
3. Select <Gantry2> and set the air pressure level for Head 11~20.

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
HEAD BLOW & VACUUM SETTING (L2)
Page
3-11-7
Note
[HEAD BLOW & VACUUM SETTING (L2)]
Check the Main Air Setting.
Check if the Digital Gauge is set to 0.5 Mpa (Spec 0.45~0.55Mpa) and if not reset it.
Check the Current Air Pressure Level
1. Select MMI <Diagnosis> → <Vacuum>.
2. While the Vacuum/Blow is Off, check the current level.
Check if the current level is 0±9 mmHg.
If not, adjust the VR of the Head IO Board.
3. Check the same thing for Gantry2's Head 7~12.