EN 3.pdf - 第194页
Model DECAN Series Company SAMSUNG TECHWIN Module 3.1 1 HEAD V ersion 01 Tit le BALL SPLINE REPLAC EME NT (F2) Page 3-1 1-34 Note 5. Separate the Z Cap by releasing the fixing bolts. 6. Using a spanner , fix the spanner …

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
BALL SPLINE REPLAC EMENT (F2)
Page
3-11-33
Note
[BALL SPLINE REPLACEMENT (F2)]
1. Separate the Air Pressure Tube from the Air Module.
2. Release the fixing bolts for the Air Module and separate the Air Module.
3. Lower the Spindle that you want to separate.
4. Separate the Z Sensor Dog by releasing the fixing bolts.

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
BALL SPLINE REPLAC EMENT (F2)
Page
3-11-34
Note
5. Separate the Z Cap by releasing the fixing bolts.
6. Using a spanner, fix the spanner location of the spline and then using another spanner, release and remove
the lock nuts.
7. Separate the Spline by moving it downward.

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
BALL SPLINE REPLAC EMENT (F2)
Page
3-11-35
Note
8. Replace it with a new Spline.
9. Refer to the following when you assemble it.
Before inserting the Ball Spline, spray EP2 to the Main Body.
Check for interferences when the Spline moves up and down.
Spray EP2 grease on the Ball Spline insertion location of the Main Body.
After assembly, measure the resistance of the Z Rod Housing and the Z Top Housing.(0.060 Kgf or below)