EN 3.pdf - 第196页
Model DECAN Series Company SAMSUNG TECHWIN Module 3.1 1 HEAD V ersion 01 Tit le BALL SPLINE REPLAC EME NT (L2) Page 3-1 1-36 Note [BALL SPLINE REPLACEMENT (L2)] 1. Separate the Air Pressure Tube and t he Cable connected …

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
BALL SPLINE REPLAC EMENT (F2)
Page
3-11-35
Note
8. Replace it with a new Spline.
9. Refer to the following when you assemble it.
Before inserting the Ball Spline, spray EP2 to the Main Body.
Check for interferences when the Spline moves up and down.
Spray EP2 grease on the Ball Spline insertion location of the Main Body.
After assembly, measure the resistance of the Z Rod Housing and the Z Top Housing.(0.060 Kgf or below)

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
BALL SPLINE REPLAC EMENT (L2)
Page
3-11-36
Note
[BALL SPLINE REPLACEMENT (L2)]
1. Separate the Air Pressure Tube and the Cable connected to the Air Module of the Air Head.
2. Release the fixing bolts for the Air Module and separate the Air Module.
3. Separate the Coil Tube and the Joint Assy.

Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
BALL SPLINE REPLAC EMENT (L2)
Page
3-11-37
Note
4. Separate the Spindle and the Sensor Dog.
5. Separate the Ball Spline.
6. Replace it with a new Ball Spline.